Bedrijfsprofiel · Overig
No Bridge Too Far
- Medewerkers
- 2–10
- Opgericht
- 2017
- Provincie
- Zeeland
- Land
- Nederland
Over No Bridge Too Far
In a remote region of Morocco, many villages share a school and a hospital, but are separated by a river. Most of the year it is dry enough to cross but every winter the river floods for periods up to two months. This results in many villages being cut off, not only from healthcare and education, but also the national road network for general supplies. This creates several problems for school children and the sick. As such our team has assembled to construct a 32 meter long bridge to overcome this issue. The team is working on the designing, calculations, permits, implementation, health and safety, and the eventual construction of the bridge. This project is a humanitarian project. All members volunteer their time and work. This also means that all funding for the purchasing of materials is done through sponsorship.
Trefwoorden
- Business Management
- Business Management
- Civil Engineering
- Cross-Cultural Management
- Finance
- Logistics
- Logistics
- Marketing
- Marketing
- Mechanical Engineering
- Project Management
- Public Speaking
- Public Speaking
- Structural Engineering
Adres
Hoofdkantoor
Edisonweg 4A4382NW VlissingenZeeland, Nederland
Vergelijkbare bedrijven
Bedrijven met een vergelijkbaar profiel, eerst die uit Zeeland.

Dutch Bridges
Civil Engineering
0–1 medewerkersBekijk profiel

BRIDGES2000 BV
Facilities Services · Zevenbergen
11–50 medewerkersBekijk profiel
St Bridge to Better Future
Education Management · Amsterdam
2–10 medewerkersBekijk profiel
Innovative Bridge BV
Renewables & Environment · Rotterdam
2–10 medewerkersBekijk profiel
Bridge to Better
Non-Profit Organization Management · Amsterdam
2–10 medewerkersBekijk profiel
World Green Bridge
Research · Eindhoven
11–50 medewerkersBekijk profiel